Installed post-tension reinforcement beneath an existing timber roof beam

Engineered reinforcement for existing structures

More strength.
Less disruption.Post-tension systems

Targeted reinforcement for existing beams—planned around your building, its loads and its operations.

50+Years of experience
24/7Emergency shoring
Class BLicensed General ContractorCA CSLB #309472 ↗
Commercial& industrial focus

Retain the structure. Increase its capacity.

Reinforcement that works with your building.

Post-tension systems use steel tension rods or high-strength cables to reinforce existing members. Depending on the condition and engineering requirements, they can increase capacity and help control deflection without replacing the entire beam.

SPS evaluates the existing structure and coordinates the repair approach with project engineering. The right solution starts with understanding the cause of distress and the demands on the building.

Explore glu-lam beam repair
Close-up of post-tension rod hardware at a timber beam
Precision in the connections. Performance in the system.

Where post-tension can make a difference

New demands.
A considered structural response.

Every application requires a review of existing conditions, load requirements and connection details.

Added rooftop loads

Evaluate reinforcement when new HVAC or mechanical equipment changes the demands on existing beams.

Changes in building use

Assess capacity for uses such as cold-storage conversions and other changes in structural loading.

Overstressed or damaged beams

Consider targeted strengthening for overstressed glu-lams or restoration after damage, where appropriate.

SPS crew working on an existing timber beam repair

Plan the work around the operation

A focused repair.
A coordinated installation.

A targeted system may reduce the need to relocate utilities, sprinklers or ceilings. Site access, temporary support and installation sequencing are considered alongside the permanent repair.

  • Evaluate the member and its connections
  • Coordinate reinforcement with project engineering
  • Plan access, support and installation
  • Communicate the repair sequence with your team

Start with the right information

Have plans, photos or a new equipment load?

Share the project address, any available drawings, visible damage and the proposed change in use or loading. These details help SPS understand the next step in an evaluation.

Is post-tension reinforcement right for every beam?

No. The condition of the wood, connection capacity, load path and project requirements determine whether a post-tension system is appropriate. An evaluation may identify another repair approach.

Can the building remain in operation?

Access, work areas and temporary support requirements vary. SPS coordinates the scope and sequence with your team so operational constraints are part of the planning.

Let’s strengthen what’s already working.

Discuss your building, its condition and what comes next.